Summary of EGYPS 2023
After one month of hard work, the FAT tests of the Fire and Gas control Panels of Alexandria Petroleum Company have been carried out in just two days. Many thanks to Deutschland Technology Limited, the main contractor, Petrojet the general contractor and Alex Petroleum Company the owner, for their complete confidence in KMT, and we look forward to more successful national projects in the near future.
A report on the participation of KMT for Industrial Services in EGYPS 2022 in its fifth session,
Which was inaugurated by President Abdel Fattah Al-Sisi. The report was broadcast through “Al-Hayat Alyoum” program.
Sunday 21-2-22 , 8:15 PM
Quality of work, commitment, and accuracy in execution.
After 4 months of hard work, Saraya Factory is partially opened being the first factory in Egypt and the Middle East for Saraya International Group for the production of cosmetics.
KMT had a large share in the implementation of the electrical works in this large project.
Thank you Hassan Allam Group and Saraya International Group for your trust in KMT.
Our CENTERLINE® 2500 IEC Low Voltage motor control centers (MCCs) are designed to meet global application requirements.
By combining a smaller footprint and comprehensive type testing, the CENTERLINE 2500 MCCs help meet the needs of customers.
Our MCCs also help meet the global demand for factory-ready, space-, energy-, and cost-efficient motor control solutions.
Thanks, Eng. Ahmed Ramdan
© Copyright 2015. All Rights Reserved.